Playa del Carmen
Mexico
ESRUEN Book a tour

Twenty-Sixth Construction Update

February 24, 2024Day 370Rising floor by floor17 photos

Welcome to our latest construction update!

The casting of the 2nd level slab cover was completed to commence work on the 3rd level. Topographic tracing was conducted for the layout of walls on the 3rd level, along with the installation of outlets for electrical boxes, switches, and lighting fixtures on the below levels. Hydraulic and sanitary outlets were incorporated into the new casting area. Additionally, the plastering of walls and leveling of the mezzanine was carried out.

Did you know?

Mexico City is sinking at an alarming rate! Due to the city being built on a lakebed and the excessive groundwater extraction, some parts of the city are sinking up to 12 inches (30 cm) annually. This has caused various infrastructure challenges, including uneven roads and buildings and issues with the city’s drainage and sewage systems.

As always, it’s been a pleasure to bring you this update, and we look forward to the next one on the new moon in a few weeks.

With love,
Luna Residences Team

All construction updates

You have seen it built. Now see it finished.

The building is complete and owners have moved in. The people who built Luna will walk you through it, in person or on a live video call.

Book a private tour
WhatsApp